Inspection

(a) Check the resistance of the relay. Standard:

Tester Connection

Specified Condition

3-5

10 kil or higher

(when battery voltage is applied to terminals 1 and 2)

If the result is not as specified, replace the relay.

(a) Check the resistance of the relay. Standard:

Tester Connection

Specified Condition

3-4

Below 1 Q

3-5

10 kil or higher

(when battery voltage is applied to terminals 1 and 2)

If the result is not as specified, replace the relay.

-20 0 20 40 60 80 100 (-4) (32) (68) (104) (140) (176) (212)

Temperature 4D (Wj

3. INSPECT ENGINE COOLANT TEMPERATURE SENSOR

(a) Check the resistance between terminals 1 and 2. Standard:

Condition

Specified Condition

Approx. 2O0D (68«)

2.29 to 2.6 kil

Approx. 80« (176«)

0.300 to 0.327 kil

If the result is not as specified, replace the sensor. NOTICE:

When checking the ECT sensor in the water, the terminals should be kept dry. After the check, dry the sensor.

If the result is not as specified, replace the sensor. NOTICE:

When checking the ECT sensor in the water, the terminals should be kept dry. After the check, dry the sensor.

DIY Battery Repair

DIY Battery Repair

You can now recondition your old batteries at home and bring them back to 100 percent of their working condition. This guide will enable you to revive All NiCd batteries regardless of brand and battery volt. It will give you the required information on how to re-energize and revive your NiCd batteries through the RVD process, charging method and charging guidelines.