NOTE Be careful of the terminal insulator installation direction

2006 ELECTRICAL Charging - Sequoia

Fig. 36: Installing Terminal Insulator

Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.

Fig. 36: Installing Terminal Insulator

Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.

b. Install the end cover with the 3 nuts.

2006 ELECTRICAL Charging - Sequoia

Fig. 37: Installing End Cover With Nuts

Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.

5. CHECK THAT ROTOR ROTATES SMOOTHLY

INSTALLATION

1. INSTALL GENERATOR

a. Install the generator with the bolt and the 2 nuts.

Torque: Bolt 39 N*m (400 kgf*cm, 29 ft.*lbf) Nut 10 mm 39 N*m (400 kgf*cm, 29 ft.*lbf) Nut 8 mm 15.5 N*m (158 kgf*cm, 11 ft.*lbf)

b. Connect the generator connector.

c. Connect the generator wire with the nut.

d. Install the terminal cap.

e. Install the wire clamp to the cord clip on the generator.

2006 ELECTRICAL Charging - Sequoia

2. INSTALL PS VANE PUMP (See INSTALLATION )

3. INSTALL DRIVE BELT

a. Install the belt by turning the belt tensioner counterclockwise.

Was this article helpful?

0 0
Do It Yourself Car Diagnosis

Do It Yourself Car Diagnosis

Don't pay hundreds of dollars to find out what is wrong with your car. This book is dedicated to helping the do it yourself home and independent technician understand and use OBD-II technology to diagnose and repair their own vehicles.

Get My Free Ebook


Post a comment