FIPG Part No Three Bond or equivalent

HINT:

Install the actuator within 10 minutes after applying FIPG.

d. Install the A.D.D. actuator with the 4 bolts. Torque: 21 N*m (210 kgf*cm, 15 ft.*lbf)

2007 DRIVELINE/AXLES Differential - Sequoia

Fig. 93: Applying FIPG To Clutch Case

Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.

Fig. 93: Applying FIPG To Clutch Case

Courtesy of TOYOTA MOTOR SALES, U.S.A., INC.

INSTALLATION

1. INSTALL DIFFERENTIAL MOUNT STOPPERS

a. Install the 2 front mounting cushions with the 5 bolts.

b. Install the rear mounting cushion with the 2 bolts. Torque: 108 N*m (1,100 kgf*cm, 80 ft.*lbf)

2. INSTALL FRONT DIFFERENTIAL CARRIER ASSEMBLY

a. Jack up the front differential.

b. Install the 2 front mounting bolts.

d. Remove the jack.

3. INSTALL TUBE WITH WIRE HARNESS

a. Install the tube with wire harness assembly with the bolt.

b. Connect the actuator connector, vacuum hose and breather hose.

4. CONNECT FRONT PROPELLER SHAFT ASSEMBLY (See INSTALLATION )

5. INSTALL FRONT DRIVE SHAFT ASSEMBLY RH

INSTALLATION

6. INSTALL FRONT DRIVE SHAFT ASSEMBLY LH INSTALLATION

7. FILL DIFFERENTIAL WITH HYPOID GEAR OIL (See REPLACEMENT )

Was this article helpful?

0 0
Do It Yourself Car Diagnosis

Do It Yourself Car Diagnosis

Don't pay hundreds of dollars to find out what is wrong with your car. This book is dedicated to helping the do it yourself home and independent technician understand and use OBD-II technology to diagnose and repair their own vehicles.

Get My Free Ebook


Post a comment