Installation Of Engine

INSTALL CLUTCH DISC AND COVER (See page CL-15)

2. INSTALL TRANSMISSION TO ENGINE

INSTALL A/T OIL COOLER PIPES

4. INSTALL ENGINE WITH TRANSMISSION IN VEHICLE

(at Attach the engine hoist chain to the engine hangers.

(b) Lower the engine into the engine compartment.

(c) Align the engine with the transmission and engine mounting supports.

(d) Install the engine mounting washers and nuts on each side of the engine.

(e> Remove the hoist chain.

5. RAISE VEHICLE

6. INSTALL ENGINE REAR SUPPORT MEMBER WITH GROUND STRAP TO BODY

7. INSTALL FRONT CROSS MEMBER

INSTALL CLUTCH RELEASE CYLINDER

INSTALL MANUAL SHIFT LINKAGE (See page AT-19)

10. CONNECT SPEEDOMETER CABLE

11. INSTALL PROPELLER SHAFT (See page PR-9)

12. INSTALL EXHAUST PIPE

13. CONNECT FUEL HOSES

INSTALL ENGINE MOUNTING ABSORBER

15. CONNECT GROUND STRAP TO FUEL HOSE CLAMP

INSTALL SHIFT LEVER

17. CONNECT ENGINE OIL COOLER HOSES

18. INSTALL PS PUMP

INSTALL NO.6 AIR CLEANER HOSE

20. INSTALL A/C COMPRESSOR

21. CONNECT HEATER HOSES

22. CONNECT FOLLOWING CONNECTORS AND WIRES:

(a) ECU and ECT connectors

(b) Ground strap to engine rear side

(c) Heater valve connector

Oxygen sensor connector

(e) Alternator connector and wire

(f) Main relay connector

Ignition coil connector

(7M-GTE) Igniter connector

Solenoid resister connector

(i) Check connector

(j) Theft deterrent horn connector

(k) Noise filter connector

(I) Battery positive cable to battery

(m) Ground strap to LH front fender apron

23. CONNECT FOLLOWING HOSES:

(a) Charcoal canister hose

(b) Cruise control hose (c> Heater valve hose (d) Brake booster hose

24. INSTALL PS BELT (See page MA-4)

25. INSTALL ALTERNATOR DRIVE BELT. WATER PUMP PULLEY AND FLUID COUPLING

27. INSTALL RADIATOR (See page CO-14)

INSTALL NO.7 AIR CLEANER HOSE WITH AIR FLOW METER AND AIR CLEANER CAP

(a) Connect the PS air hose.

(b) Connect the air flow meter connector.

(c) Connect the three air hose and PCV hose.

INSTALL AIR CLEANER CASE WITH HOSES

(a) Install the air cleaner case with hoses with the three bolts.

(bl Conncct the PS air hose.

(c) Connect the air flow meter connector.

INSTALL NO.4 AIR CLEANER PIPE WITH NO. 1 AND N0.2 AIR CLEANER HOSES

31. FILL WITH ENGINE OIL (See page LU-6)

32. FILL WITH COOLANT (See page CO-5)

33. INSTALL HOOD

34. CONNECT CABLE TO NEGATIVE TERMINAL OF BATTERY

35. START ENGINE

Warm up the engine and inspect for leaks.

36. INSTALL ENGINE UNDER COVER

37. PERFORM ENGINE ADJUSTMENT

Recheck the ignition timing. (See page IG-20)

38. ROAD TEST Road test vehicle.

39. RECHECK COOLANT AND ENGINE OIL LEVELS

Was this article helpful?

+1 0

Post a comment